Tuesday, April 1, 2014

EDUCE HOME 8


The e250g is now comfortably occupied by its Owners while the final finishing of the exterior is competed.





The high performance, German manufactured, 2 storey high curtain-wall sections are framed with a unique, siding material that is produced from compressed layers of FSC Certified paper.



The front entry deck and stairway are underway which will be followed by landscaping.


The front entrance door closeup.


The rear deck completed and awaiting the installation of railings.





 The rear curtail-wall system will be framed with same compressed paper siding material that has been installed on the front facade.

No comments:

Post a Comment